MisuJob - AI Job Search Platform MisuJob

Quality Control Inspector - Data Center Construction

Confidential

Port Washington, Wisconsin permanent

Posted: March 19, 2026

Interested in this position?

Create a free account to apply with AI-powered matching

Quick Summary

Quality Control Inspector to ensure construction activities meet project specific codes, standards, and specifications in a data center construction project in Port Washington, Wisconsin.

Job Description

The Weitz Company is hiring a Quality Control Inspector to work on a hyperscale data center in Port Washington, WI!

The Quality Control Inspector is responsible for ensuring construction activities meet project specific codes, standards and specifications by planning, inspecting, documenting and organizing tasks to promote efficiencies on an assigned construction project site. This role examines ongoing work on the project site to monitor alignment with company and client expectations, and remedy identified issues. The Quality Control Inspector typically reports to the Project Manager or Quality Control Manager. 

The Weitz Company has been Building a Better Way since 1855. We are a full-service construction company, general contractor, design-builder, and construction manager with office locations throughout the United States. We believe our employees to be our most valuable asset, and we are committed to growing a diverse and inclusive culture that inspires, motivates, and continuously improves.

What You’ll Do:

Understand project scope and quality requirements, contract documents, site drawings, manufacturer product data/manuals and company quality plan and standards; ensure project is constructed accordingly

Schedule, conduct and evaluate various site inspections, quality monitoring and surveillance of daily and upcoming work (i.e. first work, follow up, regulatory agency, underground utility, concrete pour, material, off-site, final rough-in)

Prepare inspection and test plans; document testing, measurements, inspection reports and other quality reports; maintain necessary quality-related files and compile necessary documents for project turnover to owner

Identify and report non-conforming work; track on non-conformance log; assist with issuing related reports

Oversee development and review of daily construction reports, field observation reports, punch lists, quality reports and as-built drawings

Stay abreast of federal, industry and company standards; educate project teams of compliance requirements and changes

Partner with project safety team to determine hazards and identify needs or processes to remedy; proactively eliminate or minimize identified hazards

Ensure inspections, observations and punch list are documented and stored in accordance to company policy

Monitor project site adherence to company quality plan and standards; propose updates or modifications to management for review

Utilize virtual and physical mock-ups to establish quality standards and identify lean processes to improve field productivity

Establish and maintain working relationships with owners, architects, subcontractors, vendors and internal team members to ensure company quality plan is adhered to

Perform other duties as assigned

 

What We’re Looking For:

Experience:

A minimum of three (3) years of construction-related experience is required. Construction field experience is preferred. 

Experience in a fast-paced environment

LEAN principles experience is desirable.  

Data center experience is strongly preferred.

Skills:

Excellent verbal and written communication

Ability to balance and prioritize projects with impending deadlines

 Detail-oriented and highly organized 

Business acumen and relationship-building skills

Technology:

Candidate should have experience with Microsoft Office Suite, Apple products (iPhone & iPad) and have the ability to learn specific software.

Solid systems experience with Procore and Bluebeam is preferred.

Training will be provided on company standards.

What We Offer: 

Competitive Pay

Rewarding Bonus Program

Comprehensive Benefits Package with Tax-Advantaged HSA and FSA offerings

Employer-Paid Short- and Long-Term Disability Programs

Employer-Paid Life Insurance

Generous Paid Time Off Provisions

401K Retirement Savings Plan with Company Match

Tuition Reimbursement

Fully Paid Parental Leave

Voluntary Products Including: Critical Illness Insurance and Accident Insurance

Corporate Wellness Program with Wellness Time Off and Rewards

 

Visa sponsorship is not available for this position at this time. 

 

The Company does not accept unsolicited resumes from search firms or agencies. Any resume submitted to any employee of the Company without a prior written search agreement will be considered unsolicited and the property of the Company. Please, no phone calls or emails.

 

The Weitz Company, LLC (and its U.S.-based subsidiaries and affiliates) recognizes the value of and is committed to hiring and retaining a diverse and inclusive workforce. We are an Equal Opportunity Employer and follow applicable affirmative action guidelines and policies. All qualified applicants will receive consideration for employment (including minorities, females, veterans, and individuals with disabilities, regardless of sexual orientation, gender identity, or other protected categories in accordance with applicable ​state and federal laws). The Company is a drug and alcohol-free workplace and background checks are required if applicable. Click here to review our Privacy Notice.  

 

#LI-MR1

Why Apply Through MisuJob?

AI-Powered Job Matching: MisuJob uses advanced artificial intelligence to analyze your skills, experience, and career goals. Our matching algorithm compares your profile against thousands of job requirements to find positions where you have the highest chance of success. This saves you hours of manual job searching and ensures you only see relevant opportunities.

One-Click Applications: Once you create your profile, applying to jobs is effortless. Your resume and cover letter are automatically tailored to highlight the most relevant experience for each position. You can apply to multiple jobs in minutes, not hours.

Career Intelligence: Beyond job matching, MisuJob provides valuable career insights. See how your skills compare to market demands, identify skill gaps to address, and understand salary benchmarks for your experience level. Make data-driven decisions about your career path.

Frequently Asked Questions

How do I apply for this position?

Click the "Register to Apply" button above to create a free MisuJob account. Once registered, you can apply with one click and track your application status in your dashboard.

Is MisuJob free for job seekers?

Yes, MisuJob is completely free for job seekers. Create your profile, get matched with jobs, and apply without any cost. We help you find your dream job without any hidden fees.

How does AI matching work?

Our AI analyzes your resume, skills, and experience to understand your professional profile. It then compares this against job requirements using natural language processing to calculate a match percentage. Higher matches mean better fit for the role.

Can I apply to jobs in other countries?

Absolutely. MisuJob features jobs from companies worldwide, including remote positions. Filter by location or look for remote opportunities to find jobs that match your preferences.

Ready to Apply?

Join thousands of job seekers using MisuJob's AI to find and apply to their dream jobs automatically.

Register to Apply